
Case study
Strip-out of existing services, installation of a new mechanical ventilation system and upgrade of the existing LV electrical systems.
LIME delivered an upgrade at Leith Community Treatment Centre for NHS Lothian, replacing existing services with a new mechanical ventilation system alongside upgrades to the building’s LV electrical infrastructure.
The works modernised essential building services, delivering improved ventilation and upgraded electrical infrastructure to support the facility’s ongoing operation.
NICEIC approved contractor and Constructionline member. Accredited to ISO 9001, ISO 14001 and ISO 45001.