Case study
Small power, lighting, fire alarm, door access and data refit on a compressed programme alongside arriving furniture.
The project scope for Red Rock Renewables covered small power, lighting, fire alarm, door access and data, including distribution works, modifications to existing busbar systems, installation of floor boxes, data infrastructure, lighting alterations, and the introduction of new decorative lighting.
We managed access and egress around the installed furniture using appropriate equipment such as desk gliders, allowing teams to work safely above desks without disruption. Additional labour was brought onto the project to protect the delivery date, and stakeholder engagement was maintained throughout through weekly progress meetings and site visits.
Completed on schedule despite a compressed programme caused by delays in design information and the client's furniture arriving on site mid-build. Additional labour was brought on to protect the delivery date, with weekly progress meetings keeping stakeholders aligned throughout.
NICEIC approved contractor and Constructionline member. Accredited to ISO 9001, ISO 14001 and ISO 45001.